Question: ***PLEASE SHOW WORK FOR ALL CALCULATIONS*** Below are the project steps for the creation of a television advertisement for Energyblast, which is a new energy



***PLEASE SHOW WORK FOR ALL CALCULATIONS***
Below are the project steps for the creation of a television advertisement for Energyblast, which is a new energy drink that the Professor has created to keep students awake. Consider the following data: How many paths are there through the network? a. 2 b. 3 c. 4 d. 5 Which path is the least amount of time? a. A,B,C,D,E,F,G b. A,B,D,F,G c. A,C,D,F,G d. A,C,E,F,G Which Path is the Critical Path? a. A,B,C,D,E,F,G b. A,B,D,F,G c. A,C,D,F,G d. A,C,E,F,G Which of the following activities have slack? a. A b. B c. E d. F What is the slack for activity C ? a. 0 b. 1 c. 2 d. 3 What is the expected duration of this project? a. 19 b. 20 c. 21 d. 22 In these network diagrams, slack is best described a measurement of what? a. The difference between an activity's normal cost and its crash cost b. The difference between an activity's early start and late start times c. The difference between the duration of two precedent activities d. The difference between an activity's early finish and late start times Which of the following statements about a network's critical path(s) is always true? a. The critical path(s) is vital to managing a project becasue any delays of activities on the critical path will delay the project. b. The critical path(s) is the path that gets us through the network fastest. c. The critical path(s) is the path that passes through the most slack activities d. The critical path(s) is the path that passes through the most activities
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
