Question: PLEASE SHOW WORK! NEED ASAP! THANK YOU! Chapter 10 - Design of Work Systems: Stopwatch Time Study Given the following data from a stopwatch time

PLEASE SHOW WORK! NEED ASAP! THANK YOU! Chapter
PLEASE SHOW WORK! NEED ASAP! THANK YOU!
Chapter 10 - Design of Work Systems: Stopwatch Time Study Given the following data from a stopwatch time study for a particular task: 1. What is the observed time for this task? [15 seconds] 2. If the person observed worked at a pace that is 20% slower than normal, what should be the normal time for this task? Hint: start by first determining the performance rating [12 seconds] 3. If the person observed worked at a pace that is 20 percent faster than average, what should be the normal time for this task? Hint: start by first determining the performance rating [ 18] seconds] 4. Referring to question #2, if the appropriate allowance for this task is 25% of job time, what should be the standard time? [25 seconds] 5. Referring to question #3, if the approprlate allowance for this task is 25 percent of the workday, What should be the standard time? [24 seconds]

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!