Question: please show work - thanks window 2. There are two products being produced by a firm with the following bills of material: C D P

please show work - thanks
window 2. There are two products being produced by a firm with the following bills of material: C D P Q (3) P (2) R S (2) Routing Information (all times in hours) Operatio n 0.6 40 Product Lot Size /Part 20 D P 100 Q 70 R 50 R 50 S 100 5 100 Work Center 100 100 200 300 200 300 200 300 1 of 1 1 of 1 1 of 1 1 of 1 1 of 2 2 of 2 1 of 2 2 of 2 Setup Run Time hours Per Unit PC 0.7 .03 0.8 1.2 .02 1 0.4 .004 2 0.7 .029 1.6 0.5 .032 0.8 1.2 .016 1.2 0.5 2012 0.5 0.9 .005 -73 1.22 .404 1729 -532 1.216 -512 905 With this information, set up the capacity bills and determine the capacity needed per work center to run the following master schedule: Week Product C Product D 1 50 20 2 40 25 3 45 20 Lot Size Operatio n Product /Part D P 20 40 100 70 50 50 100 100 Work Center 100 100 200 300 200 300 200 300 1 of 1 1 of 1 1 of 1 1 of 1 1 of 2 2 of 2 1 of 2 2 of 2 Setup hours 0.6 0.8 1 2 1.6 0.8 1.2 0.5 Run Time Per Unit 0.7 1.2 0.4 0.7 0.5 1.2 0.5 0.9 Setup per part .03 .02 2004 .029 .032 .016 .012 .005 .73 1.22 404 .729 1532 1.216 .512 .905 R S S With this information, set up the capacity bills and determine the capacity needed per work center to run the following master schedule: Week Product C Product D 1 50 20 2 40 3 45 20 25 Week 2 Week 1 Week 3 Work Center D D C D 100 200 300 Fill in the Work Center Load in the table above. (Hint Develop the Capacity Bills window 2. There are two products being produced by a firm with the following bills of material: C D P Q (3) P (2) R S (2) Routing Information (all times in hours) Operatio n 0.6 40 Product Lot Size /Part 20 D P 100 Q 70 R 50 R 50 S 100 5 100 Work Center 100 100 200 300 200 300 200 300 1 of 1 1 of 1 1 of 1 1 of 1 1 of 2 2 of 2 1 of 2 2 of 2 Setup Run Time hours Per Unit PC 0.7 .03 0.8 1.2 .02 1 0.4 .004 2 0.7 .029 1.6 0.5 .032 0.8 1.2 .016 1.2 0.5 2012 0.5 0.9 .005 -73 1.22 .404 1729 -532 1.216 -512 905 With this information, set up the capacity bills and determine the capacity needed per work center to run the following master schedule: Week Product C Product D 1 50 20 2 40 25 3 45 20 Lot Size Operatio n Product /Part D P 20 40 100 70 50 50 100 100 Work Center 100 100 200 300 200 300 200 300 1 of 1 1 of 1 1 of 1 1 of 1 1 of 2 2 of 2 1 of 2 2 of 2 Setup hours 0.6 0.8 1 2 1.6 0.8 1.2 0.5 Run Time Per Unit 0.7 1.2 0.4 0.7 0.5 1.2 0.5 0.9 Setup per part .03 .02 2004 .029 .032 .016 .012 .005 .73 1.22 404 .729 1532 1.216 .512 .905 R S S With this information, set up the capacity bills and determine the capacity needed per work center to run the following master schedule: Week Product C Product D 1 50 20 2 40 3 45 20 25 Week 2 Week 1 Week 3 Work Center D D C D 100 200 300 Fill in the Work Center Load in the table above. (Hint Develop the Capacity Bills Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock