Question: please show your work $200,000, find the cost iu | 3-27. Extended Learning Exercise. You have beer to prepare a quick estimate of the construction

please show your work $200,000, find the cost iuplease show your work $200,000, find the cost iu

please show your work

$200,000, find the cost iu | 3-27. Extended Learning Exercise. You have beer to prepare a quick estimate of the construction a coal-fired electricity generating plant and facili work breakdown structure (levels one through ih Table P3-27. You have the following informar available: have been asked tion cost for facilities. A ough three) is ne of the one 1996 boiler s110 million A coal-fired generating plant twice the size of the you are estimating was built in 1996. The 1996 (1.2) and boiler support system (1.3) cost $110 mil The cost index for boilers was 110 in 1996, it is 40 2019. The cost capacity factor for similar boilers support systems is 0.9. The 600-acre site is on prop you already own, but improvements (1.1.1) roads (1.1.2) will cost $2,000 per acre, and railroads (1.1.3) will cost $3,000,000. Project integration (1.9) is projected to cost 3% of all other construction costs. The security systems (1.5.4) are expected to cost $1,500 per acre, according to recent (2019) construction of similar plants. All other support facilities and equipment (1.5) elements are to be built by Viscount Engineering. Viscount Engineering has built the support facilities and equipment elements for two similar generating plants. Their experience is expected to reduce labor requirements substantially: a 90% learning curve can be assumed. Viscount built the support facilities and equipment on their first job in 95,000 hours. For this project, Viscount's labor will be billed to you at $60 per hour. Viscount estimates that materials for the construction of the support facilities and equipment elements (except 1.5.4) will cost you $15,000,000. The coal storage facility (1.4) for the coal-fired generating plant built in 1996 cost $5 million Although your plant is smaller, you require the same size coal storage facility as the 1996 plant. You assunt you can apply the cost index for similar boilers u coal storage facility. What is your estimated 2019 cost for bu the coal-fired generating facility? Summar calculations in a cost estimating worksheet, and the assumptions you make. Summarize your ksheet, and state TABLE P3-27 Work Breakdown Structure for Problem 2-4 001 1.2 010 PROJECT: Coal-Fired Electricity Generating plant and Facilities Line No. Title WBS Element Code Coal-fired power plant 002 Site 003 1.1 Land improvements 1.1.1 004 Roads, parking, and paved areas 1.1.2 005 Railroads 1.1.3 006 Boiler 007 Furnace 1.2.1 008 Pressure vessel 1.2.2 009 Heat exchange system 1.2.3 Generators 1.2.4 011 Boiler support system 1.3 012 Coal transport systems 1.3.1 SE-E 013 Coal pulverizing system 1.3.2 014 Instrumentation and control 1.3.3 Ash disposal system 1.3.4 Transformers and distribution 1.3.5 017 Coal storage facility 1.4 018 Stockpile reclaim system 1.4.1 Rail car dumpl on 019 a n b 1.4.2 020 Coal handling equipment 1.4.3 Support facilities and equipment 1.5 Hazardous waste systems 023 Support equipment 1.5.3 Utilities and communications system Tot 1.5.4 Total Security systems 1 1.9 Project integration 027 Project management od 1.9.2 028 Environmental management 1.9.3 M b Project safety 1.9.4 Quality assurance 1.9.5 031 Test, start-up, and transition management 015 (2 - 021 1 1.5. 0 022 024 025 026 029 030 ameldo 51927 $200,000, find the cost iu | 3-27. Extended Learning Exercise. You have beer to prepare a quick estimate of the construction a coal-fired electricity generating plant and facili work breakdown structure (levels one through ih Table P3-27. You have the following informar available: have been asked tion cost for facilities. A ough three) is ne of the one 1996 boiler s110 million A coal-fired generating plant twice the size of the you are estimating was built in 1996. The 1996 (1.2) and boiler support system (1.3) cost $110 mil The cost index for boilers was 110 in 1996, it is 40 2019. The cost capacity factor for similar boilers support systems is 0.9. The 600-acre site is on prop you already own, but improvements (1.1.1) roads (1.1.2) will cost $2,000 per acre, and railroads (1.1.3) will cost $3,000,000. Project integration (1.9) is projected to cost 3% of all other construction costs. The security systems (1.5.4) are expected to cost $1,500 per acre, according to recent (2019) construction of similar plants. All other support facilities and equipment (1.5) elements are to be built by Viscount Engineering. Viscount Engineering has built the support facilities and equipment elements for two similar generating plants. Their experience is expected to reduce labor requirements substantially: a 90% learning curve can be assumed. Viscount built the support facilities and equipment on their first job in 95,000 hours. For this project, Viscount's labor will be billed to you at $60 per hour. Viscount estimates that materials for the construction of the support facilities and equipment elements (except 1.5.4) will cost you $15,000,000. The coal storage facility (1.4) for the coal-fired generating plant built in 1996 cost $5 million Although your plant is smaller, you require the same size coal storage facility as the 1996 plant. You assunt you can apply the cost index for similar boilers u coal storage facility. What is your estimated 2019 cost for bu the coal-fired generating facility? Summar calculations in a cost estimating worksheet, and the assumptions you make. Summarize your ksheet, and state TABLE P3-27 Work Breakdown Structure for Problem 2-4 001 1.2 010 PROJECT: Coal-Fired Electricity Generating plant and Facilities Line No. Title WBS Element Code Coal-fired power plant 002 Site 003 1.1 Land improvements 1.1.1 004 Roads, parking, and paved areas 1.1.2 005 Railroads 1.1.3 006 Boiler 007 Furnace 1.2.1 008 Pressure vessel 1.2.2 009 Heat exchange system 1.2.3 Generators 1.2.4 011 Boiler support system 1.3 012 Coal transport systems 1.3.1 SE-E 013 Coal pulverizing system 1.3.2 014 Instrumentation and control 1.3.3 Ash disposal system 1.3.4 Transformers and distribution 1.3.5 017 Coal storage facility 1.4 018 Stockpile reclaim system 1.4.1 Rail car dumpl on 019 a n b 1.4.2 020 Coal handling equipment 1.4.3 Support facilities and equipment 1.5 Hazardous waste systems 023 Support equipment 1.5.3 Utilities and communications system Tot 1.5.4 Total Security systems 1 1.9 Project integration 027 Project management od 1.9.2 028 Environmental management 1.9.3 M b Project safety 1.9.4 Quality assurance 1.9.5 031 Test, start-up, and transition management 015 (2 - 021 1 1.5. 0 022 024 025 026 029 030 ameldo 51927

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!