Question: Please show your work. I need work to D and E question. Use Goal Seek. Thank you IIT- Ready | NTY III The these Listen

 Please show your work. I need work to D and Equestion. Use Goal Seek. Thank you IIT- Ready | NTY III The

Please show your work. I need work to D and E question. Use Goal Seek.

Thank you

these Listen be See all of your work in Put A AMINA
bel The computer hardware of a ple 11.15 PAS The change www

IIT- Ready | NTY III The these Listen be See all of your work in Put A AMINA bel The computer hardware of a ple 11.15 PAS The change www Cate co AMINS day way Ama 2,15 NTV DY is the HINT SPV Per AMINO E Forefunga DAMINE The 50 Nov. Tudi NY IN WACC When you ANNA AMUN, Amazon.com, Inc.: Capital Budgeting Analysis Amazon.com (ticker: AMZN) is considering installing a new and highly sophisticated computer system to help expand its business, which would cost $74 million. Delivery and installation would add another $1.3 million to the initial cost. The new computer system has a 5-year class life under MACRS. Because of the half-year convention, it will take six years for Amazon to fully depreciate the cost of the system (MACRS percentages: 20, 32, 19, 12, 11 and 6 percent), and at the end of Year 6 the salvage value of the system is estimated to be 55.XXX million, where XXX are the digits found in your KU email address. Additional data: = If the new system is purchased, revenue is expected to increase over the present level by $103 million in each of the first three years, by $96 million in Year 4, and by $88 million in Years 5 and 6. (These improvements are incremental, not cumulative.) The increase in operating costs is projected at $71.5 million for each of the six years. Amazon's federal-plus-state income tax rate is 37.5 percent. The project's cost of capital is 8.5 percent. = It is expected that installation of the new system would cause the following changes in working capital accounts (1) an increase in receivables of $26 million because of expanded services, (2) an increase in inventories of $5.5 million, and (3) an increase in accounts payable and accruals combined equal to 58 million. Using Excel, do the following: A State the basic assumptions of the problem in an assumption block." This means that you should display in the upper left-hand corner of the spreadsheets all the relevant quantitative information given above, whether it actually changes in the problem or not. 1. Follow the analysis provided in your Ch. 12 PowerPoints and Table 12.1 in the e-book. The main difference is this project runs for six years while the example in the book runs for just four years. 2. Calculate the net cash outflow at time zero (t = 0) if Amazon goes ahead with this expansion. 3. Construct a table similar to that shown below to calculate net operating cash flows for Years I through 6 (in thousands). 4. Calculate the NPV of the expansion project (NPV - PV of all cash flows minus cash outflow at t-0). I recommend you check the answer you get in Excel with your calculator. Both NPVsin Excel and with the calculator should be equal. 2 5 Year Revenue Operating costs Depreciation (DEP) Income before tax Taxes Net income (NI) Operating cash flow (NI + DEP) Recovery of Working Capital Salvage after tax Total project cash flows (operating + non-operating) NPV The real power of Excel spreadsheets is their ability to perform sensitivity analyses (answer "what-if" questions). It is therefore crucial that you set up your model such that the stated assumptions in Part A are the underlying determinants of the capital budgeting calculations performed in Part A. A change in any one of the assumptions in Part A will then automatically cause a recalculation of the project's NPV. In other words, be sure to use formulas and refer back up to earlier cell addresses whenever appropriate. If your model is constructed correctly, the remaining questions should require very little time to answer. Save all of your work in Part A as AMZN-A (the tab name). The Excel file you submit will be an Excel workbook with a series of five spreadsheets. B. Because computer hardware and software prices are notoriously difficult to estimate beyond a couple of yearslet alone resale values the salvage value of the new system is somewhat "iffy." However, the Forecasting Department guesses that the salvage value will not drop below $1.75 million. Using this worst-case scenario as far as salvage is concerned, what is the new NPV? Other assumptions are as in Part A. Simply copy your first spreadsheet to create a new spreadsheet and name it AMZN-B. Then change the salvage value to the new value. The new NPV value should appear as soon as you enter the new salvage value, if your model has been constructed properly. C. While analyzing the project, you suddenly realize that the current tax law actually allows Amazon to depreciate the computer system over four years instead of six. Assume percentages of 33, 45, 15, and 7 percent, and assume that the system will, in fact, be used for six years as originally planned. All other assumptions are as in Part B. Calculate a new NPV and name this spreadsheet as AMZN-C. D. Your boss would also like to know just how sensitive the NPV of the project is to operating costs. What is the highest annual operating cost increase associated with the project that would result in a positive NPV? (HINT: Find the answer using the "Goal Seek" function in Excel. Solve for the operating cost that sets NPV to $1. If your NPV cell is in units of thousands, an NPV of $I would be shown as $0.001 in the spreadsheet, meaning that you'll need to change the format to $x.xxx.) All other assumptions are as in Part C. Name this spreadsheet AMZN-D. E. For the final spreadsheet, change annual operating costs back to $71.5 million. Then, find the IRR of the project using "Goal Seek." (HINT: Solve for the cost of capital that sets the NPV to zero.) All other assumptions are as in Part D. Save as AMZN-E. The cost of capital cell should be highlighted yellow with the cost that generates a $0 NPV. That is the definition of IRRit's the WACC that produces a zero NPV. Other details for the project: Each students needs to do his or her own project independently. You can check with the professor with questions. Each spreadsheet in your Excel workbook must be labeled (e.g., AMZN-A, AMZN-B, etc.) Highlight (e.g., underline, bold, italics, highlighter, etc.) the information asked for in each part (e.g., highlight the resulting NPV in Part B). Deposit your Excel workbook in D2L assessment submission folder by the deadline shown in D2L. Academic integrity is very important. Any student caught copying another student's workbook will earn a zero on this assignment

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!