Question: please solve all the questions a) Construct the AON project network b) what is the minimum time needed to complete the above project c) crash

please solve all the questions a) Construct the
please solve all the questions a) Construct the please solve all the questions
please solve all the questions a) Construct the
a) Construct the AON project network
b) what is the minimum time needed to complete the above project
c) crash the project with the maximum amount possible (use a table)
please solve all the questions a) Construct the
D) determine the additional crashing cost?
e) formulate the problem of crashing this project duration down to 30 days as a linear program? (clearly define the decision variables and write out each and every constraint)
postosown in the following table Activity Immediate predecessor Normal duration (days) Cost per day to crash (in 1000's) Available days to crash 3 6 3 1 AD 7 5 0 AB 3 7 2 5 4 CD 3 10 G 5 CD 3 H 6 2 2 4 um amount potuit Make use of the table below to CLEARLY show the sequence of crashing the different activities and the duration ched Addas many chans and/or rows as needed ORI al Construct the AON project network to created and redo What is the murumum trebeeded to complete the above project Cath the project the maximum amount possible Make use of the table below to CLEARLY show the sequence of crashing the different activities and the duration by which activities are being crashed Add as many columns and/or rows as needed Normal Jurtir Length after crashing any di Determine the additional crashing out el formulate the problemething this project duration down to days as a linear program (clearly define the decision variables and write out each and every constraint De NOI deseori formulation A project consists of eight activities as shown in the following table: Activity Immediate predecessor Normal duration (days) 8 Cost per day to crash (in 1000's) 6 Available days to crash A 3 B 6 3 1 7 5 3 AB AB 8 7 2 5 4 Ju lol 3 CD 10 5 3 CD 9 6 2 H EF 11 2 4 a) Construct the ADN project network (make sure to include both stortrade and a finish node ds many and/or rows as Path Normal duration Length after crashing activity Cost

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!