Question: a) Construct the AON project network (make sure to include both a start node and a finish node). b) What is the minimum time needed

a) Construct the AON project network (make sure

a) Construct the AON project network (make sure to include both a start node and a finish node). b) What is the minimum time needed to complete the above project? c) Crash the project the maximum amount possible. Make use of the table below to CLEARLY show the sequence of crashing the different activities, and the duration by which activities are being crashed. Add as many columns and/or rows as needed. Length after crashing activity Path Normal duration - - - Cost - d) Determine the cost of the crashed project? e) Formulate the problem of crashing this project duration down to 30 days as a linear program (clearly define the decision variables and write out each and every constraint. Do NOT provide a generic formulation). a) Construct the AON project network (make sure to include both a start node and a finish node). b) What is the minimum time needed to complete the above project? c) Crash the project the maximum amount possible. Make use of the table below to CLEARLY show the sequence of crashing the different activities, and the duration by which activities are being crashed. Add as many columns and/or rows as needed. Length after crashing activity Path Normal duration - - - Cost - d) Determine the cost of the crashed project? e) Formulate the problem of crashing this project duration down to 30 days as a linear program (clearly define the decision variables and write out each and every constraint. Do NOT provide a generic formulation)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!