Question: please solve both the parts and please show complete steps thankyou also draw the chart in part b [414 JUULIVlty ratio of this manufacturing process?[3]

please solve both the parts and please show complete steps thankyou also draw the chart in part b
[414 JUULIVlty ratio of this manufacturing process?[3] b) A group of five jobs is to be processed through a two-machine flow shop. The first operation involves grinding and the second involves polishing. Determine a sequence that will minimize the total completion time for this group of jobs. Processing times are as follows: Job (Grinding) (Polishing) Job (Grinding) (Polishing) A 5 10 D 8 6. B- 7 2 E 3 5 10 5. c) Assign trucks to delivery routes so that total costs are minimized, given the cost data shown. What is the minimum total cost? [5]/4 ROUTE . 8 E 1 5 9 7 4 5 2 Truck 3 4 5 6 7 5 6 ouvoir 6 8 10 5 3v AAW 000 8 2 5 9Step by Step Solution