Question: please solve it in details 2. Draw the network on the basis of the most likely durations. Find critical path. Calculate the the duration of

please solve it in details 2. Draw the network onplease solve it in details

2. Draw the network on the basis of the most likely durations. Find critical path. Calculate the the duration of the path with at least a 90% confidence level? Activity IPA Duration (Days) Optimistic (To) Most Likely (Tm) Pessimistic (p) 4. 6 11 A B D E F G H A, B B D D. E C.F. G C G H1 4 9 4 7 5 10 8 3 2 6 15 11 10 8 16 5 4 7 6 3 2