Question: please solve manually or in ampl Demand for electricity over the next month is projected to be constant and exactly 424MW. There are 7 power

please solve manually or in ampl Demand forplease solve manually or in ampl

Demand for electricity over the next month is projected to be constant and exactly 424MW. There are 7 power plants that, when turned on for the month, can be continuously regulated to produce between li and uiMW for i=1,,7. There is a fixed cost of si dollars for every power plant i that is turned on, and a variable cost of ci dollars per MW. 1. Write a mixed-integer linear optimization model to find a minimum-cost plan to operate the power plants that guarantees that the demand is satisfied. (You do not need to solve the model.) 2. Add a linear constraint: At least 3 plants need to be turned on. 3. Add a linear constraint: Plant 3 and 7 cannot be both turned on. 4. Add a linear constraint: If plants 4 and 5 are both on, then also plant 6 must be on

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!