Question: please solve this question and all its parts, please! Below is the location of a Sandy lot situated at a prime location in Bnaid Al
please solve this question and all its parts, please!
Below is the location of a Sandy lot situated at a prime location in Bnaid Al Gar-Block 3. Your team is assigned the project of turning it to a new extension of Shaheed Park. Unfortunately, your company won the bid by committing to a stringent due date, perhaps even unrealistic. You are supposed to deliver the project in 30 days, after which the contract states a penalty of KWD3,200 day. The Google Maps Coordinates are as follows: 29.376694904706273, 47.99776821397016 ernational The table below was generated after surveying several contractors, and includes the activities' times (days), predecessors, costs (KWD), as well as the crash times. Crash Cost Activity Predecessor(s) Optimistic Most Likely Pessimistic N.Time Normal Cost CrashTime A 19 21 23 21.00 10,000 19 11.000 B 13 20 21 19.00 9,000 13 15,000 C 10 13 22 14.00 7,400 6 10,200 D C 12 16 12.00 9,600 8 23,200 E C 7 10 19 11.00 12,000 3 16,800 F 8 10 12 10.00 8,000 8 16,800 G 7 9 11 9.00 11,000 7 13,400 H 7 9 11 9.00 12,800 7 27,200 1 8 12 16 12.00 6,400 8 14,000 1 8 9 10 9.00 9,000 8 15,600 K 9 11 19 12.00 6,900 9 12,900 L 14 15 22 16.00 14,400 14 18,200 M 8 10 12 10.00 13,800 8 15,100 N 7 11 15 11.00 10,000 7 24,800 0 11 12 13 12.00 9,000 11 19,200 P 6 9 12 9.00 7,400 6 17,900 Q 7 10 13 10.00 9,600 4 14,100 Case Report Perform an analysis of the project and prepare a report presenting your findings and recommendations Include (but do not limit your discussion to) a consideration of the following items. 1. Develop a network drawing and determine the critical path (using normal times). How long is the park extension expected to take? 2. What is the probability for the project to take longer than 30 days? 3. Your company's reputation is at stake, and the CEO has instructed your team to crash the project as needed in order to deliver the park in 30 days. Obviously, your crashing costs should not exceed the penalty ones. Report the crashed project time along with the associated costs and net savings. P.S. Both MS-Project file and Word report should be submitted C E,F,K HIJ L N.O B.P.M 79 St Below is the location of a Sandy lot situated at a prime location in Bnaid Al Gar-Block 3. Your team is assigned the project of turning it to a new extension of Shaheed Park. Unfortunately, your company won the bid by committing to a stringent due date, perhaps even unrealistic. You are supposed to deliver the project in 30 days, after which the contract states a penalty of KWD3,200 day. The Google Maps Coordinates are as follows: 29.376694904706273, 47.99776821397016 ernational The table below was generated after surveying several contractors, and includes the activities' times (days), predecessors, costs (KWD), as well as the crash times. Crash Cost Activity Predecessor(s) Optimistic Most Likely Pessimistic N.Time Normal Cost CrashTime A 19 21 23 21.00 10,000 19 11.000 B 13 20 21 19.00 9,000 13 15,000 C 10 13 22 14.00 7,400 6 10,200 D C 12 16 12.00 9,600 8 23,200 E C 7 10 19 11.00 12,000 3 16,800 F 8 10 12 10.00 8,000 8 16,800 G 7 9 11 9.00 11,000 7 13,400 H 7 9 11 9.00 12,800 7 27,200 1 8 12 16 12.00 6,400 8 14,000 1 8 9 10 9.00 9,000 8 15,600 K 9 11 19 12.00 6,900 9 12,900 L 14 15 22 16.00 14,400 14 18,200 M 8 10 12 10.00 13,800 8 15,100 N 7 11 15 11.00 10,000 7 24,800 0 11 12 13 12.00 9,000 11 19,200 P 6 9 12 9.00 7,400 6 17,900 Q 7 10 13 10.00 9,600 4 14,100 Case Report Perform an analysis of the project and prepare a report presenting your findings and recommendations Include (but do not limit your discussion to) a consideration of the following items. 1. Develop a network drawing and determine the critical path (using normal times). How long is the park extension expected to take? 2. What is the probability for the project to take longer than 30 days? 3. Your company's reputation is at stake, and the CEO has instructed your team to crash the project as needed in order to deliver the park in 30 days. Obviously, your crashing costs should not exceed the penalty ones. Report the crashed project time along with the associated costs and net savings. P.S. Both MS-Project file and Word report should be submitted C E,F,K HIJ L N.O B.P.M 79 St
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
