Question: please solve with all steps written down and clear all manually showing from where we got each value. thank you 8 A plant manufactures three

please solve with all steps written down and clear all manually showing from where we got each value. thank you please solve with all steps written down and
8 A plant manufactures three parts, A, B, and C, to be assembled into a product. Turret lathes are required for one operation on each of the three. For planning purposes it is as- sumed that plant personnel work at 70 percent of normal and lathes have a utilization probability of 0.90. Policies establish that no run will be for less than the monthly pro- duction requirement. The plant works an 8-hour, 5-day week, and setup is carried out during the regular work shift. The required production is 10,000 per month (4.2 weeks/month). It is desired to determine: (a) the number of lathes; (b) the number of turret lathe operators; (c) the number of turret lathe setup workers. The following data are given (including setup time per machine): Product Operation Time (h) Defective (%) Setup time(h/month) A B A-747 B-214 C-103 0.083 0.031 0.117 3.4 2.6 1.5 10 14 12

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!