PROBLEM-4) (20 Pts.) Consider the assembly line balancing problem represented by the network in the following figure. The performance times are shown above the nodes. 8 6 9 12 5 3 2 5 10 7 8 6 1 5 4 7 9 11 a. Determine a balance for C=24. (12 Pts.) b. What is the minimum cycle time that can be achieved using the number of stations you obtained? (8 Pts.) 10 8 3 12Step by Step Solution