Question: Plot the rainfall hyetograph ( in / hr vs . time ) in 1 5 - min intervals. ( b ) Plot the cumulative mass

Plot the rainfall hyetograph (in/hr vs. time) in 15-min intervals.
(b) Plot the cumulative mass curve for rainfall (in vs. time).
(c) Plot the hydrograph (flow rate vs. time).
(d) Determine the time period with the highest rainfall intensity.
(e) Compute the volume of infiltration loss (in ac-ft) for the storm by subtracting the
volume of runoff from the volume of gross rainfall