Question: pls solve part b A production process at Kenneth Day Manufacturing is shown in the figure below. Tho driling cperabion occurs soparatoly from, and simultareoubly
A production process at Kenneth Day Manufacturing is shown in the figure below. Tho driling cperabion occurs soparatoly from, and simultareoubly wet, the sawing and sanding. utich are independent sequential operations. A product needs to go through only one of the three assembly operations (the cperations are in parallel) a) is the botsaneck. b) The botieneck time is fyimbes per unit (round your response to two decimal places)