Question: plz answer all will thumbs up ! Required information Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product

 plz answer all will thumbs up ! Required information Lakeside Inc.

manufactures four lines of remote control boats and uses activity-based costing toplz answer all will thumbs up

! Required information Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost. Activity Cost Pools Machining Setup Quality control Estimated Total Cost Estimated Cost Driver $383,400 13,500 machine hours 71,910 360 batches 111,780 810 inspections Compute the activity rates for each of the following activity cost pools: (Round your answers to 2 decimal places.) Machining Setup Costs Quality Control per Machine Hour per Batch per Inspection Suppose the Speedy boat requires 2,520 machine hours, 100 batches, and 300 inspections. Using the activity rates, determine the amount of overhead assigned to the Speedy product line. (Round your intermediate calculations to 2 decimal places and your final answers to the nearest dollar amount.) Allocated Overhead Cost Pool Machining Setup Costs Quality Control Total Overhead $ 0

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!