Question: Prepare a memo for Pipe Pro setting out your calculations, results, and suggestions for the estimate of the stormwater drainage system. The memo should include

 Prepare a memo for Pipe Pro setting out your calculations, results,

and suggestions for the estimate of the stormwater drainage system. The memo

Prepare a memo for Pipe Pro setting out your calculations, results, and suggestions for the estimate of the stormwater drainage system. The memo should include the following information: 1. The total quantities of excavated material, bedding material, and backfill measured in loose cubic yards (LCY). Use the cross section provided by Dirt Diggers. Total Pipe Length: 2000 ft slopes 38. 34 36" bedding material Figure 1. Cross Section of Trench Material Properties: Excavation: Swell Factor: 35% Compaction: Bedding Material Shrinkage: 23% Backfill Shrinkage: 48% Volume Excavation Bedding Backfill BCY (Bank) CCY (Compacted) LCY (Loose) The unit price and total price for each item in Dirk's fax. The total price of the stormwater system. Add 10% to your estimate for profit; otherwise you will get in trouble with your uncles. Fax from Dirk Dirkson with items to be priced Item Description Quantity Unit Unit Price ($/) Total Price Trench Excavation LCY Pipe Material LF Bedding Material LCY Place Bedding Material hr Compact Bedding hr Material Lay & Joint Pipe hr Backfill Trench hr Compact Backfill hr Overhead hr

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!