Question: Prepare a process-oriented WBS for your project and break down each branch to a minimum of three layers. The WBS should contain a minimum of
Prepare a process-oriented WBS for your project and break down each branch to a minimum of three layers. The WBS should contain a minimum of 20 WBS elements at the lowest level of the breakdown structure. At a minimum, be sure to include engineering, procurement, and construction among the top WBS elements