Question: Presently, one operator is tending five identical machines. Each machine is used to produce similar products. With 5 machines it has been observed that during

Presently, one operator is tending five identical machines. Each machine is used to produce similar products. With 5 machines it has been observed that during a cycle a total of 20 machine-minutes is consumed in machines waiting for service to begin. In the past, it was observed that the operator was idle for 10 minutes each cycle when assigned to tend 3 machines. If machining time is 25 minutes and independent operator time is 1 minute per machine cycle, what is the value for concurrent activity? If C1 equals $4? hour and C2 equals $6? hour, what is the economic assignment? What is the value of the minimum cost per unit produced?
A construction firm is working on a roadway for which dump trucks and power shovels are the primary equipment being used. Time studies reveal the following time values (minutes)
\table[[Time to load a truck,15],[Travel time to dumping point,15],[Dumping time,3],[Return time,13]]
(a) What is the minimum number of trucks that will prevent idle time on the part of the power shovel?
(b) Suppose that it costs $25 per hour to operate the power shovel and $15 per hour to operate each truck. How many trucks should be assigned to the job to minimize the cost per truck load hauled?
(c) Construct a man-machine chart for the most economical arrangement between dump trucks and the power shovel.
 Presently, one operator is tending five identical machines. Each machine is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!