Question: Problem 04-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.] Craft Pro Machining produces machine

![[The following information applies to the questions displayed below.] Craft Pro Machining](https://dsd5zvtm8ll6.cloudfront.net/si.experts.images/questions/2024/09/66e2f4bd5aa51_82066e2f4bcedf17.jpg)
Problem 04-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.] Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Indirect Materials Other Overhead Indirect Labor $380,000 $ 205,000 Production Activity Grinding Polishing Product modification Providing power System calibration 650,000 $ 210,000 560,000 Additional information on the drivers for its production activities follows. Grinding and Polishing Product modification Providing power System calibration 9,000 machine hours 1,500 engineering hours 20,000 direct labor hours 700 batches Job 4286 2,125. urits 4,508 MH Number of units Machine hours Engineering hours Batches Direct labor hours Job 3175 170 units 450 MH 27 eng hours 15 batches 490 DLH 26 eng houns 45 batches 4,410 DLA Problem 04-3A Part 5 Required: 5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) Overhead costs Direct labor hours Product DL hours Plantwide OH Total Overhead Cost rate s 0.00 S 0 Units Produced OH Cost per unit es Job 3175 Job 4286 $ 0.00 $ 0
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
