Question: Problem 1 (12 points) Consider the following seven tasks that must be assigned to four workers on an assembly line that is paced with a

Problem 1 (12 points) Consider the followingProblem 1 (12 points) Consider the followingProblem 1 (12 points) Consider the following

Problem 1 (12 points) Consider the following seven tasks that must be assigned to four workers on an assembly line that is paced with a conveyor belt (i.e. machine-paced line flow). Task number Duration (seconds) 1 100 2 30 3 85 4 40 5 60 6 50 7 100 The current conveyor-paced assembly line configuration assigns the workers in the following way: Worker 1: Tasks 1 and 2 Worker 2: Task 3 and 4 Worker 3: Task 5 and 6 Worker 4: Task 7. Question A (3 points): What is the capacity of the current line? Write your answer in units per hour. Note: use at least two significant figures. Question B (3 points): Imagine the process starts empty (that is, there are not units / inventory in the system) at 1pm. At what time will the process finish to produce 26 units? Remember that the assembly line is machine-paced. Question C (3 points): Write down in a table the idle time per unit for each of the four workers. What is the connection between that idle time table and the labor utilisation? Question D (3 points). Now assume that tasks are allocated to maximize the capacity of the line, subject to the conditions that (1) a worker can only perform two adjacent operations and (2) all tasks need to be done in their numerical order. What is the capacity of this line now

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!