Question: PROBLEM 1 (20 points) Draw the precedence diagram for the following process. Include the time associated with each task in your diagram. Precedence Task A

PROBLEM 1 (20 points) Draw the precedence diagram

PROBLEM 1 (20 points) Draw the precedence diagram for the following process. Include the time associated with each task in your diagram. Precedence Task A B C D E F A A B, C D E Time (mins) 2 1 3 2 3 3 If the desired cycle time is 4 minutes and the minimum number of workstations is 4, arrange the tasks in the assembly line by placing them into one of the 4 workstations below. Indicate below each box, the associated workstation time. WS1 WS2 WS3 WS4