Question: Problem 1: 20 Points The Elon Engineering manufactures two industrial sized electrical motors: Alset I and Alset IT. Both of these products require wiring and

Problem 1: 20 Points The Elon Engineering manufactures two industrial sized electrical motors: Alset I and Alset IT. Both of these products require wiring and testing during the assembly process. Each Alset I motor requires 5 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each Alset II motor requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. The company has 260 hours of wiring time and 140 hours of testing time available in the next production period. Due to a backlog. at least 50 Alset IT motors are required to be produced. Unit Profit Ds Maz Profit cl cz cz o Dvz = [ 1] Used You are required to use the optimization template as dem L Name the decision variables: 2. What is the optimal valuss of the decision variables: 3. What is the optimal objactive function
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
