Question: Problem #1 - (3 POINTS) - A Product-Mix Problem Two-Tech Inc. is a small manufacturing firm and produces two microwave components, known as Component A

Problem #1 - (3 POINTS) - A Product-Mix Problem

Problem #1 - (3 POINTS) - A Product-Mix Problem Two-Tech Inc. is a small manufacturing firm and produces two microwave components, known as Component A and Component B. The profit per unit of the Component A is $20, whereas the profit per unit of Component B is $30. Because of contractual commitments, Two-Tech must manufacture at least 25 units of Component A per week, and based on the present demand for its products, it can sell all that it can manufacture. However, it wishes to maximize profit while operating the production department within the following availability of hours in the Assembly and Testing departments: Assembly hours: 240 hours available per week Testing hours: 140 hours available per week Component A requires 4 hours of assembly and 1 hour of testing, while Component B requires 3 hours and 2 hours, respectively. The problem is to determine the optimal number each component to manufacture based on the limited resources available. The decision variables directly under Two-Tech's control are: Xz: amount of Component A manufactured per week Xz: amount of Component B manufactured per week Formulate and explain the mathematical model for this LP problem, including: a. The Objective Function b. All the constraints that the solution must satisfy, including nonnegativity. Extra Points Opportunity

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!