Question: Problem 1 ( 4 0 points ) Consider a line with two single - machine stations. Both machines take = 2 0 mins and have
Problem points Consider a line with two singlemachine stations. Both machines take mins and have Between the two machines there is a buffer that can hold jobs. a Model the system using an MMb queue. i What is the TH ii What is the WIP iii What is the CT for the line b Reduce the buffer to one and make the process time at the first machine to be mins. Re compute the above three measures.