Question: Problem 1 ( 4 0 points ) Consider a line with two single - machine stations. Both machines take = 2 0 mins and have

Problem 1(40 points) Consider a line with two single-machine stations. Both machines take =20 mins and have =1. Between the two machines there is a buffer that can hold 10 jobs. (a) Model the system using an M/M/1/b queue. (i) What is the TH (ii) What is the WIP (iii) What is the CT for the line (b) Reduce the buffer to one and make the process time at the first machine to be 10 mins. Re- compute the above three measures.