Question: Problem 1 A 75 MW hydropower plant is to be constructed by building a dam on a river. The river flows at a rate of

 Problem 1 A 75 MW hydropower plant is to be constructed

Problem 1 A 75 MW hydropower plant is to be constructed by building a dam on a river. The river flows at a rate of 10.5 m/s. (a) Determine the required height of the dam. (b) What turbine type would you select for this plant