Question: Problem 1. A batch in a semi-automated machine from a sequential batch production operation consists of 500 parts. The setup takes 1.5 hours. Every cycle,

 Problem 1. A batch in a semi-automated machine from a sequential

Problem 1. A batch in a semi-automated machine from a sequential batch production operation consists of 500 parts. The setup takes 1.5 hours. Every cycle, an operator loads the machine in 10 minutes, and unloads the machine in 5 minutes. The processing time per piece is 4.5 minutes per part. Tool and handling time is 30 seconds using an automated robot. Ten parts are produced each cycle. Answer correctly and show your calculations: What is the average production rate in minutes per batch? (20 Points) What is the time to complete one batch in hours? (20 Points)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!