Question: Problem #1 A manufacturing facility is setup to manufacture A CD cabinet that has a product structure shown in the following figure. The MPS of

Problem #1 A manufacturing facility is setup to manufacture A CD cabinet that has a product structure shown in the following figure. The MPS of the CD cabinet is given in the following table. Week 1 2 3 4 5 6 7 8 9 Quantity 25 25 25 25 30 30 30 30 35 10 35 11 35 12 35 The data of the inventory file for 10 iterns of the CD cabinet and its subassemblies and components are given in the following table: Scheduled Inventory On Receipts Lot Size Rule hand (Quantity, week) item 50 100 CD Cabinet Cabinet Top Magnet Hinges (30, 6) (300,S! FOQ80 units FPO (periods) lot-for-lot EPP-100 FOQ, holding cost-1 SR/unit/week, Ordering cost 100 SR/order Handle (30,5) Screws (100,2) POQ a) Construct the time-phased product structure for the CD cabinet. b) Develop the MRP table (POR) for each of the sex items Problem #1 A manufacturing facility is setup to manufacture A CD cabinet that has a product structure shown in the following figure. The MPS of the CD cabinet is given in the following table. Week 1 2 3 4 5 6 7 8 9 Quantity 25 25 25 25 30 30 30 30 35 10 35 11 35 12 35 The data of the inventory file for 10 iterns of the CD cabinet and its subassemblies and components are given in the following table: Scheduled Inventory On Receipts Lot Size Rule hand (Quantity, week) item 50 100 CD Cabinet Cabinet Top Magnet Hinges (30, 6) (300,S! FOQ80 units FPO (periods) lot-for-lot EPP-100 FOQ, holding cost-1 SR/unit/week, Ordering cost 100 SR/order Handle (30,5) Screws (100,2) POQ a) Construct the time-phased product structure for the CD cabinet. b) Develop the MRP table (POR) for each of the sex items
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock