Question: Problem 1 : A site is prepared for construction by adding 1 m of sand and gravel fill, in a section of the site a
Problem : A site is prepared for construction by adding of sand and gravel fill, in a section of the site a square footing is installed and applies a load of to the soil below. Assume that the fill and footing are placed at the same time. Perform calculations by dividing the clay layer into sublayers and estimate the ultimate settlement of the footing due to the combined load of the fill and the footing.
Estimate the settlement of the footing with the : method.
Work shown in figure is not the : method and S m value is not known if correct.
Write any assumptions made and write down process along the way