Question: Problem 1 Consider a line with three stations in series. The processing times of stations 1 , 2 , and 3 , are 3 0
Problem Consider a line with three stations in series. The processing times of stations
and are and seconds, respectively. Each station has one worker. Assume that
the coefficient of variation CV of each station is and the arrival CV is also
a Calculate the total WIP if the line is run as a Push system with jobs per hour
Round your final answer down to the nearest integer Note: I suggest you return to
original equations to solve this problem.
b Write the equation you used to calculate WIP in part a
c If the system is run as a ConWIP line with WIP what is the line throughput?
d If the marginal profit per job is $ and the cost for each unit of WIP $ use Solver
to calculate the maximum profit for both Push and ConWIP configurations of the line.
e Write the equation you used to calculate profit for the Push and ConWIP lines.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock