Question: Problem 1 : Consider a transportation network designed to handle 4 0 0 0 0 vehicles per hour. An unprecedented flooding event after 5 months
Problem : Consider a transportation network designed to handle vehicles per hour. An unprecedented flooding event after months of construction, has reduced the capacity of the network gradually to vehicles per hour in days. If the disrupted network stays at this state for days and gradually increases back to preflood levels in days, identify different terms as indicated in the figure below and calculate the performance loss due to the flooding.