Question: Problem 1 : Consider the same project from Problem 1 ( i . e . , the network diagram should look identical ) . The

Problem 1:
Consider the same project from Problem 1(i.e., the network diagram should look identical). The
network diagram above is based on the most likely duration time for each activity. The table below
now provides additional information regarding the optimistic and pessimistic duration times.
(a) Determine the expected project completion time and the variance of the critical path using
expected time as duration. (Hint: Compare the most likely time for each activity to the
duration in Problem 1.2 points)
Consider a path A-C-H for the following problems.
(b) Find the probability that the completion time of the path A-C-H will be 21 weeks or more.
(3 points)
(c) Find the probability that the completion time of the path A-C-H will be 19 weeks or more.
(3 points)
(d) Find the probability that the completion time of the path A-C-H will be 22 weeks or less.
(3 points)1. Consider the following network diagram for a project (the times shown are in weeks):
Problem 1 : Consider the same project from

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!