Question: Problem 1 : Curve Numbers and Unit Hydrograph ( 2 0 pts ) . You are doing a project calculating flooding in an industrial Problem

Problem 1: Curve Numbers and Unit Hydrograph (20 pts). You are doing a project calculating flooding in an industrial Problem 1.4(7 pts): Your engineering firm has determined a unit hydrograph for your watershed, given in the table
below:
Using the effective precipitation found in Problem 3, apply this unit hydrograph to find the direct runoff hydrograph.
Create a table that shows the runoff values, in cfs, as a function of time. Also provide a plot of streamflow as a function
of time. Assume no baseflow.
Problem 1.5(1 pt): Analyzing the graph made in Problem 4, at which hour does the peak streamflow occur?
Problem 1.6(3pt): What percentage of the flow amount from the rain event at t=3 hours is from rainfall that occurs in
the first hour?
area. The swampy soil conditions indicate that AMC III is appropriate for all Curve Numbers.
Your engineering firm has determined the following land use categories at the site:
Problem 1.1(3 pts): Calculate a curve number for the site (make sure to consider AMC). You will need to use a weighted
average calculation to consider the different soil types and land uses.
Problem 1.2(3 pts): Using what you know about Curve Numbers, would the curve number increase, decrease, or stay
the same, if the entire site was HSG A? Explain why.
Problem 1.3(3 pts): You are analyzing a severe storm that had large amounts of rainfall over the course of 3 hours.
Determine the effective precipitation for each of these rainfall amounts. In your calculation, use the Curve Number you
found in Problem 1.1. Note that here you will be using different values of la, as noted in the table:Problem 1: Curve Numbers and Unit Hydrograph (20 pts). You are doing a project calculating flooding in an industrial
area. The swampy soil conditions indicate that AMC III is appropriate for all Curve Numbers.
Your engineering firm has determined the following land use categories at the site:
Problem 1.1(3 pts): Calculate a curve number for the site (make sure to consider AMC). You will need to use a weighted
average calculation to consider the different soil types and land uses.
Problem 1.2(3 pts): Using what you know about Curve Numbers, would the curve number increase, decrease, or stay
the same, if the entire site was HSG A? Explain why.
Problem 1.3(3 pts): You are analyzing a severe storm that had large amounts of rainfall over the course of 3 hours.
Determine the effective precipitation for each of these rainfall amounts. In your calculation, use the Curve Number you
found in Problem 1.1. Note that here you will be using different values of la, as noted in the table:
Problem 1 : Curve Numbers and Unit Hydrograph ( 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!