Question: Problem 1 Floor - On Ltd . , operates a line that produces self - adhesive tiles. This line consists of single - machine stations
Problem FloorOn Ltd operates a line that produces selfadhesive tiles. This line consists of singlemachine stations and is almost balanced ie station rates are nearly equal A manufacturing engineer has estimated the bottleneck rate of the line to be cases per hour day and the raw. process time to be minutes. The line has averaged cases per day, and cycle time has averaged hours.
a What would you estimate average WIP level to be
b How does this performance compare to the practical worst case?
c What would happen to the performance of the line if we increased capacity at a nonbottleneck station and held WIP constant at its current level?
d What would happen to the performance of the line if we replaced a singlemachine station with four machines whose capacity equaled that of the single machine and held the WIP constant at its current level?
e What would happen to the performance of the line if we began moving cases of tiles between stations in large batches instead of one at a time?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock