Question: Problem 1 : You are tasked with machining a complex titanium alloy part using Wire EDM. The EDM machine has a maximum allowable discharge time

Problem 1: You are tasked with machining a complex titanium alloy part using Wire EDM.
The EDM machine has a maximum allowable discharge time of td =1 s, and the part re-
quires frequent sparking to avoid thermal damage.
Supply voltage: Vo =120 V
Resistance: R =4
Capacitance: C =200 F =200106 F
Desired Breakdown Voltage: Vs =80 V
Questions:
1. Calculate the charging time required to reach the breakdown voltage.
2. Calculate the sparking frequency if td is 10% of tc (charging time).
3. If you can only change the capacitance to reduce the sparking frequency without chang-
ing Vs, what new capacitance C would you need to achieve a frequency of 5 Hz?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!