Question: Problem 10.25 Peter Rourke, a loan processor at Wentworth Bank, has been timed performing four work elements, with the results shown in the following table.

Problem 10.25 Peter Rourke, a loan processor at

Problem 10.25 Peter Rourke, a loan processor at Wentworth Bank, has been timed performing four work elements, with the results shown in the following table. Task Element Observation (minutes per cycle) 2 3 4 1 1 Performance Rating 115% 90 % 80% 85% 5 0.3 0.6 2 0.4 0.6 0.5 1.5 0.4 0.7 0.4 1.8 0.7 0.7 0.6 1.9 0.5 0.5 0.6 1.7 3 0.6 1.4 4 The allowances for tasks such as this are personal, 6%; fatigue, 8%; and delay, 4%. a) The normal time for the complete operation = 2.93 minutes (round your response to two decimal places). b) The standard time for this process = minutes (round your response to two decimal places)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!