Question: PROBLEM 14.2 Using the product structure for Alpha in Solved Problem 14.1, and the following lead times, quantity on hand, and master production schedule, prepare

 PROBLEM 14.2 Using the product structure for Alpha in Solved Problem

PROBLEM 14.2 Using the product structure for Alpha in Solved Problem 14.1, and the following lead times, quantity on hand, and master production schedule, prepare a net MRP table for Alphas. ITEM LEAD TIME QUANTITY 0N HAND Alpha 1 l 0 B 2 20 C 3 0 D l l 00 E l 1 0 F l 50 Master Production Schedule for Al ha PERIOD 6 7 8 9 10 11 12 13 Gross requirements 50 50 100