Question: Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.] Craft Pro Machining produces machine
Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3
[The following information applies to the questions displayed below.] Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records.
| Production Activity | Indirect Labor | Indirect Materials | Other Overhead | ||||||||
| Grinding | $ | 400,000 | |||||||||
| Polishing | $ | 155,000 | |||||||||
| Product modification | 450,000 | ||||||||||
| Providing power | $ | 245,000 | |||||||||
| System calibration | 540,000 | ||||||||||
Additional information on the drivers for its production activities follows.
| Grinding | 14,000 | machine hours |
| Polishing | 14,000 | machine hours |
| Product modification | 1,500 | engineering hours |
| Providing power | 15,000 | direct labor hours |
| System calibration | 650 | batches |
| Job 3175 | Job 4286 | |||
| Number of units | 170 | units | 2,125 | units |
| Machine hours | 450 | MH | 4,500 | MH |
| Engineering hours | 27 | eng. hours | 28 | eng. hours |
| Batches | 15 | batches | 45 | batches |
| Direct labor hours | 410 | DLH | 3,690 | DLH |
Problem 17-3A Part 1
Required: 1. Classify each activity as unit level, batch level, product level, or facility level.
|
Problem 17-3A Parts 2, 3 & 4
2, 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing activities into a single cost pool. Determine overhead costs to assign to the following jobs using ABC. What is the overhead cost per unit for Job 3175? What is the overhead cost per unit for Job 4286? (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "overhead assigned" to the nearest whole dollar.)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Problem 17-3A Part 5
5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.)
| |||||||||||||||||||||||||||||||||||||
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
