Question: Problem 2 2 - 1 2 ( Algo ) Seven jobs must be processed in two operations: A and B . All seven jobs must
Problem Algo
Seven jobs must be processed in two operations: A and All seven jobs must go through A and in that sequenceA first, then
Determine the optimal order shortest flow time to complete all the jobs in which the jobs should be sequenced through the process using these times:
tableJobtableProcess ATimetableProcess BTimetablePosition inSequence