Question: Problem 2 - 3 3 ( modified ) , Davis and Cornwell, Introduction to Environmental Engineering, 6 th Ed . : The discharge pipe from
Problem modified Davis and Cornwell, Introduction to Environmental Engineering,
th Ed:
The discharge pipe from a sump pump in the dry well of a sewage lift station did not drain
properly, and the water at the discharge end of the pipe froze. A hole has been drilled into the
ice, and a electric heater has been inserted in the hole to melt the ice. Assume all the
heat goes into melting the ice.
a Is the system an open system or a closed system?
b Construct an energy balance for the system.
c If the discharge pipe contains of ice, how long will it take to melt the ice?