Question: Problem 2 [ 4 0 Points ] You are required to produce a signal timing plan for the intersection shown in the figure below. The

Problem 2[40 Points]
You are required to produce a signal timing plan for the intersection shown in the figure below. The volumes indicated are in veh/h and were collected during the a.m. peak hour, i.e. from 7:30 to 8:30 a.m. More data are as shown below.
Saturation flow rates (per lane):
EBWB:1100 veh/h
NB/SB: 1000 veh/h
Target vc ratio =0.90
Moderate pedestrian activity
Average approach speeds:
30mihNS
30mih E-W
Crosswalk width =10ft
All Lane widths =15ft
Level grade
Driver reaction time =1.0s
Deceleration rate (a)=10fts2
a) Determine whether a protected left-turn phase is needed.
b) Draw/tabulate your phasing plan.
c) Draw/tabulate a ring diagram, and 4 se it to determine the critical lane volumes as well as the sum of their flow ratios.
d) Determine the yellow times for each phase.
e) Determine the all red times. Use vehicle length of 18ft.
f) Compute the lost time per phase as well as the total lost fime per cycle. acouming 2 socuf start up tostime and 2 sec of clearance lost fime.
Problem 2[40 Points]
You are recutred to produce a signal timing plan for the intersection shown in the figure below. The volumes indicaled are in veh/h and were collected during the a.m. peak hour, i.e. from 7:30 to 8:30 a.m. More data are as shown below.
Saturation flow rates (per lane):
EB/WB: 1100 veh/h
NB/SB: 1000 veh/h
Target v/c ratio =0.90
Moderate pedestrian activity
Average approach speeds:
30-nith NS
30mihE EW
Crosswalk width =10ft
All Lane widths =15ft
Level grade
Driver reaction time =1.0s
Deceleration rate (a)=10fts2
a) Determine whether a protected left-tum phase is needed.
b) Draw/tabulate your phasing plan.
c) Draw/fabulate a ring diagram, and use it to determine the erlical lane volumes as well as the sum of their flow ralios.
d) Determine the yellow times for each phase.
e) Delermine the all red times. Use vehicle length of 18ft.
Compute the lost time per phase as well as the total lost time per cycle. assuming 2 sec of start-up lost lime and 2 sec of clearance lost time.
g) Compute the cycle length. Assume that it is desired to use no more ihal 90% of available capacity during the peak 15-minute period of the peak hour.
Allocate the avatalto cffoctive green time withth the evele for each ahnce Compute the actual green times.
i) Determine the E-W and N-S pedestrian crossing times. (Assume pedestrian walking speed of 3.5Hts and a maximum of 12 pedestrians crossing each stre duting any one phese?
i) Compare the vehicular green times calculated above to pedestilian green times. It necessary, adjust all vehicular green times accordingly.
Problem 2 [ 4 0 Points ] You are required to

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!