Question: Problem 2 ( 5 5 ) Given: You are tasked with evaluating three possible foundation design alternatives for a new bridge considering extreme flood limit
Problem
Given: You are tasked with evaluating three possible foundation design alternatives for a new
bridge considering extreme flood limit state, possible damage, and repair cost, and a year
design service life. The occurrence of an Extreme Flood Event is best estimated by the Poisson
distribution and the AASHTO standards require that foundations are designed for an extreme
flood event with a year recurrence Hint: annual occurrence is year Associated costs
and conditional probabilities are listed in the following table.
Find: Using DecisionTree Analysis Method provide the following:
a Construct the decision tree model representing each alternative decision and all possible
outcomes
b Determine expected value cost for each foundation type and the preferred decision
based on the minimum expected cost criteria.
c Determine the expected value of perfect information EVPI
d Develop a cumulative risk profile for each foundation decision.
e Which strategy is preferred based on total risk? Explain
f Assume that a flood study can be performed at the proposed bridge location. The firm
you plan to hire has conducted several flood studies in that region, and of those
studies resulted in reports that forecasted significant flood events. Further, the actual
occurrence of significant flood events in the region was accurate compared to the
firm's reports. What is the expected value of this firm's flood study EVSI Should you
hire them? Explain?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
