Question: Problem 2 ( 5 Points ) XDoubleBar = UCLx = LCLx = * * * * * * * * * * PLEASE SHOW YOUR

Problem 2(5 Points)
XDoubleBar =
UCLx
=
LCLx
=
********** PLEASE SHOW YOUR WORK **********
Problem 1(5 Points)
Reject Rate =
b) The company wants a target of Cp
=
RBar =
Spec. Limits =
An auto parts supplier has a target of Cp =1.00. The manufacturing process average =102 mils.
Product specification limits are 103\pm 4 mils. 20 samples are taken daily.
XDoubleBar = UCLX
=
Cp
= LCLX
=
Sample Size =
UCLR
=
Cpk =
LCLR
=
A production line consists of two machines. Injection molding and robot pick up.
Molding: Quality measured by the thickness of plastic tracked though a control chart. (1 Point)
Reject Rate =
Nominal =
USL =
LSL =
Total Process: Quality measured by all defects in the line of two machines, assume process
centered and two sided specification. (2 Points)
Robot: Quality measured by the defect rate obtained; using P chart, assume process centered and twosided specification limit.(2 Points)
Total Reject Rate:
Total Reject Rate

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!