Question: Problem 2 A contractor plans to dig an excavation as shown in the figure below. The river is at level A right now. ( a

Problem 2
A contractor plans to dig an excavation as shown in the figure below. The river is at level A right
now.
(a) To what elevation can the water rise before a quick condition will develop?
(b) Please also calculate the factor of safety (FS) against quick conditions for Problem 2a.
Elevation at which a quick condition develops)??(Elevation A.
(c) To what elevation can you continue to dig the excavation before a quick condition will
develop.
Note: you may neglect shear along sides. (Part C is most important for me)