Question: Problem 2: During an 8 hour shift a canning machine is scheduled to run continuously. It should produce 60 cans per minute but the machine

Problem 2: During an 8 hour shift a canning machine is scheduled to run continuously. It should produce 60 cans per minute but the machine ran poorly during the shift. Several jams were encountered and a breakdown finally resulted. The equipment was down for the last hour of the shift. A total of 1600 cases (12 cans per case) were produced, in addition to 125 damaged cans. Calculate OEE