Question: Problem - 2 In casting experiments performed using a certain alloy and type of sand mold, it took 1 7 0 sec for a cube

Problem -2
In casting experiments performed using a certain alloy and type of sand mold, it took 170 sec for a
cube-shaped casting to solidify. The cube was 50 mm on a side. (a) Determine the value of the mold
constant in Chvorinov's rule. (b) If the same alloy and mold type were used, find the total solidification time
for a cylindrical casting in which the diameter =50mm and length =50mm.
Problem - 2 In casting experiments performed

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!