Question: Problem 2 The table below indicates the precedence and processing time to assemble a laptop computer. As an Industrial Engineer, you must design a line
Problem
The table below indicates the precedence and processing time to assemble a laptop computer. As an Industrial Engineer, you must design a line that produces products in a hour shift. Using the given information and the method we learned in class, answer the following questions:
begintabularccc
hline Work element & Precedence & Time in minutes
hline A & & mathbf
hline B & A &
hline C & &
hline D & B C &
hline E & D &
hline F & &
hline G & &
hline H & F E G &
hline I & H &
hline K & H &
hline
endtabular
a Draw the precedence diagram.
b Draw a balanced line, including work elements in each workstation and the processing time of each workstation. Use ranked positional weights.
c Calculate the cycle time of the balanced line obtained in b
d Calculate the delay of the balanced line obtained in b
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock