Question: Problem 2 . USING VOLUME METHOD. Estimate the materials under class D mixture for the firewall shown in the figure. Use 2 0 mm thickness

Problem 2. USING VOLUME METHOD. Estimate the materials under class D mixture for the firewall shown in the figure. Use 20 mm thickness of plaster for ALL the wall surfaces and a 12 mm thick mortar in between CHB layers. Reinforcement are spaced 80 cm for vertically and every 3 horizontally. Use 30 cm long ties.
TABLE 2-1 QUANTITY OF CEMENT AND SAND FOR MORTAR AND PLASTER MIXTURE PER CUBIC METER
\table[[,,Cement in Bags,Sand],[Class,Mixture,40 kg.,50 kg.],[A,1:2,18.0,14.5,1.0],[B,1:3,12.0,9.5,1.0],[C,1:4,9.0,7.0,1.0],[D,1:5,7.5,6.0,1.0]]
TABLE 3-4 LENGTH OF STEEL BAR REINFORCEMENT FOR CONCRETE HOLLOW BLOCK WORK
\table[[Vertical Reinforcement,Horizontal Reinforcement],[\table[[Spacing],[cm.]],\table[[Length of Bars in Meter]],Spacing,Length of Bars in Meter,,],[40,0.235,2.93,2,0.284,3.30],[60,0.171,2.13,3,0.172,2.15],[80,0.128,1.60,4,0.138,1.72]]
TABLE 3-Na, is GL TIE WeE FOR CHB mENFONCEMENT PER SQUARE METER
\table[[\table[[Vertow],[Spacirg]],\table[[Horisonty],[Layer Spacing]],| Klograms per Square Mater],[25cm.Th,30cm.Te,40 cm To],[49,2,904.,065,008],[40,3,009,009,003],[40,4,.004,008,00],[60,2,308,.044,.067],[60,3,008,092,.042],[60,4,000,094,on],[80,2,.027,033,244],[80,3,000,004,9a2],[50,4,205,.0,024]]
Problem 2 . USING VOLUME METHOD. Estimate the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!