Question: Problem #2: You are a project engineer for a large road way project. The roadway to be constructed is 3 miles long and 60 feet
Problem #2:
- You are a project engineer for a large road way project. The roadway to be constructed is 3 miles long and 60 feet wide.
- The following pavement design specifications have been issued:
- Base coarse: 6 DGA
- Stabilized base: 4
- Bottom coarse of asphalt: 3
- Top coarse of asphalt: 2 Determine the following information:
- How many tons ofeach material isrequired? Research andmake an assumption ofa unit weight for each material. Draw a cross-section of the specified pavement design.
- Assuming 10 wide lanes, and that you cannot work on more than 50% of the roadway at a given time, how many pieces of the following equipment would you consider utilizing? Assemble a sketch depicting paving operations, including lanes opened/closed, and pieces of equipment utilized.
- Material hauling trucks (assume truck can carry 20 tons/load)
- Bituminous distributors
- Asphalt paving machine (assume 10 wide)
- Vibratory rollers (assume 6 wide)
- Explain your rationale through illustrations as well as written description.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock