Question: Problem 3 : 1 0 points A small assembly line for the assembly of power steering pumps needs to be balanced. The figure below is

Problem 3: 10 points
A small assembly line for the assembly of power steering pumps needs to be balanced. The figure below is the precedence diagram. The cycle time is
determined to be 1.5 minutes. How would the line be
balanced by choosing the assignable task having the longest task time first? Summarize them in the table below. And calculate the efficiency of the task after
grouping the process